Open calls · Research grant · Energy
Enhanced electric operation and battery durability (ZEWT Partnership)
European Commission · Horizon Europe · HORIZON-CL5-2027-03-D5-18
Deadlines
- 14 Apr 2027 Deadline in 154 days
Time of day: 17:00 Brussels time.
Who can apply
- Countries
- Applicants from any country can take part. Funding is usually limited to the EU, associated countries and listed low- and middle-income countries; sanctions apply to some.
- Who applies
- A consortium of organisations
Money
- Per project
- up to €10M per project
- Total budget
- €20M
- Expected awards
- 2
About the call
Expected Outcome:
Project outputs and results are expected to contribute to all the following expected outcomes:
• Demonstrate autonomy, of at least 150 nm (or 277.8 KM for inland navigation) using electrical storage as the only energy source, while allowing rapid in-route zero-emission replenishment.
• Increase the power output, providing beyond 5 MW as peak propulsion power with corresponding grid capacity.
• Improve systems to increase the number charging cycles combined with high-power charging to suit the operation needs of different ship types and services.
• Identify the operating profiles and business cases for which electric powered shipping will bring significant improvements taking into account the priorities and provisions of the Fitfor55 package, especially FuelEU Maritime, Naiades III, AFIR and RED.
• Develop solutions fitting different ship types and their operational profiles and provide roadmaps for replication.
• Address the degradation and failure in specific maritime operating conditions.
• Improved lifetime and safe use of batteries in waterborne transport by addressing the operation profiles, degradation and failure modes associated with unique waterborne transport operating conditions.
Scope:
This topic aims to improve the suitability of fully-battery-electric operation of ferries, short sea shipping, offshore and inland vessels, considering the services they provide, their operation profiles and the possibilities to interact with charging infrastructure. Aspects like increasing the autonomy range of operation and fast charging are a crucial element for short sea shipping and inland routes with short docking periods. Fast charging may also put added strain on batteries in terms of output and durability. Optimization of the onboard electrical architecture and battery chemistry as well as optimized battery monitoring and management systems and more extensive training of crew can to some extent address this challenge. Life cycle aspects should be considered by design in the integration and operation of vessels, as well as the end-of-life of batteries, making sure that operations can be performed during the whole expected life of the vessel. The topic also explores the need to increase the power capability of fully electric vessels, aiming to define scenarios in which the increase of the peak propulsion power is needed to ensure the safety of operations. Proposals should cover the interface between vessels and port operations addressing the regulatory requirements, including operational procedures.
Proposals should address all the following aspects:
• Full scale demonstration of innovative solutions for extended range and extended battery cycles beyond simple scaling up of existing commercial batteries. Solutions to increase the current operational range of electric vessels to at least 150 nm (or 277.8 KM for inland navigation) for short-sea shipping, ferries, offshore of 400-6500 GT vessels, or 86-135 meters for inland river vessels on free-flowing rivers upstream, allowing rapid in route charging and being applicable to representative operating conditions of the chosen ship. Demonstration of the vessel’s economic viability in normal operation. Demonstrations should also consider baseline reference which are already state of the art
• Identifying the operational profiles and services that require higher energy output for safe and effective operation, developing solutions and modelling scenarios to ensure safe and efficient energy management and navigation taking into account the battery pack and recharging possibilities.
• Incorporating energy-efficiency measures, including but not limited to, efficient AC-DC grid, thermal management, high voltage electrical components, energy management and energy modelling for optimal operation.
• Implementation of vessel‑wide adaptive energy‑management solutions that coordinate battery, propulsion and hotel loads, maximising cycle life while minimising emissions.
• Development of solutions for intelligent and optimized battery management to improve energy efficiency and life extension of the batteries. Furthermore, projects should consider life cycle aspects by design and address the end-of-life of batteries to ensure full electric operation during and beyond the planned operation of the vessel.
• Creating concepts for rapid zero-emission in-route charging, fast charging, offshore charging or battery replenishment, including solutions capable of supplying power to idling vessels anchored offshore near ports, while maintaining desired operating schedules, adhering to current standards.
• Encouraging modular design and ship retrofitting to facilitate replication of the solution, ideally presenting one full retrofit exercise and several replications in similar or different vessels, also including the needs of the OPS infrastructure.
• Development of recommendations and best practices for the safety assessment of the novel installations based on field testing. This should build on established safety guidelines and requirements such as the Guidance on the Safety of Battery Energy Storage Systems onboard ships (from the European Maritime Safety Agency – EMSA) and the requirements for fixed and swappable batteries on inland vessels (from the European Committee For Drawing Up Standards In The Field Of Inland Navigation – CESNI), as applicable, and contribute to their applicability to a wider scope of novel electrification solutions. Furthermore, recommendations for improving the guidelines and extending them to the demonstrated new battery installation solutions should be presented. Regulatory aspects for the pertinent safety-critical ship systems as well as fire safety solutions for the battery room should also be addressed. In addition, the recommendations should also consider how integration of the safety considerations affects the overall operational planning and economic assessments.
• The plan for exploitation and…
Text from the funder (European Commission, CC BY 4.0).
Conditions in full
"> General conditions
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In line with the “ restriction on control in innovation actions in critical technology areas ” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual .
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
described in Annex G of the Work Programme General Annexes.
Specific conditions
Not applicable.
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Guidance
HE Programme Guide
Model Grant Agreements (MGA)
HE MGA
HE Unit MGA
Call-specific instructions
Not applicable.
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 8. Climate, Energy and Mobility
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
We sort calls into fields, career stages and countries automatically. Always check the conditions on the funder’s page before you apply.
Discussion
Applying too? Looking for partners? Ask here.
