Skip to content

Research funder · United States

National Institute of Standards and Technology

Measurement standards laboratory in the United States

nist.gov

Grants since 2016
2 953
Awarded, last 5 years (where amounts are published)
$44.4B
Funded works, last 5 years
6 641
Funded works, all time
39.5k

Grants

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT. CONSTRUCT A BASELINE FOR THE STATE ON THE FIVE AREAS OF DIGITAL EQUITY (1) BROADBAND ACCESS; (2) ACCESSIBLE AND INCLUSIVE ONLINE CONTENT; (3) DIGITAL LITERACY; (4) PERSONAL DATA AND CYBER SECURITY; (5) DEVICES AND TECH SUPPORT. INVENTORY STATE STAKEHOLDER ORGANIZATIONS FOR ENGAGEMENT AND ESTABL

$1.3M

2022–2023 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: THIS PROJECT WILL PROVIDE ULTRAFAST LASER, OPTICS DESIGN SUPPORT AND EXPERTISE TO DEVELOP A TERAHERTZ (THZ) SCATTERING NEAR-FIELD OPTICAL MICROSCOPE SYSTEM. THE GOAL OF THIS PROJECT IS TO ESTABLISH NANOSCALE RESOLUTION OF CONDUCTIVITY AND MOBILITY OF FUNCTIONAL DEVICES RELEVANT TO THE SEMICONDUCTOR INDUSTRY.ACTIVITIES TO BE PERFORMED: THIS PROJECT WILL INVOLVE OPTICAL DESIGN AND SPECTROSCOPY CONFIGURATION INCLUDING; 1-IMPROVED SIGNAL-TO-NOISE FOR ACCESSING EXTREMELY SMALL SCATTERING S

$57.6k

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT CLOSING THE BROADBAND AVAILABILITY GAP AND SUPPORT THE DEVELOPMENT OF A FIVE-YEAR ACTION PLAN.THE PROPOSED PROJECT INCLUDES THE FOLLOWING PLANNING AND PRE-DEPLOYMENT ACTIVITIES: RESEARCH AND DATA COLLECTION, INCLUDING INITIAL IDENTIFICATION OF UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS CONSISTENT WITH RULES, REGULATIONS, AND PROCESSES COMMISSION HAS ESTABLISHED FOR MAKING DETERMINATIONS IN BROADBAND DATA MAPS; PUBLICATIONS, OUTREACH, AND COMMUN

$1.2B

2022–2024 · grant · ARRANGEMENTS FOR INTERDISCIPLINARY RESEARCH INFRASTRUCTURE

TITLE: PHOTONIC MULTIANALYTE BIOSENSOR FOR RAPID POINT-OF-CARE SARS-COV-2 TESTINGPURPOSE: THE PURPOSE OF THIS GRANT IS TO DEVELOP THE "PROOF OF CONCEPT" FOR A DISPOSABLE, LAB-ON-A-CHIP SOLUTION TO COVID-19 TESTING THAT DOES NOT NEED SANDWICH ASSAY, COSTLY REAGENTS, OR COMPLEX, BULKY, AND POWER CONSUMING EXTERNAL HARDWARE, WHILE OFFERING LOW TEMPERATURE SENSITIVITY. ACTIVITIES TO BE PERFORMED: THE PROJECT TEAM WILL EVALUATE AMOUNT OF SURFACE-BOUND SPECIFIC AND NON-SPECIFIC ANTIBODIES TO NUCLEOCAP

$299.1k

2022–2024 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: THIS PROJECT IDENTIFIES 4 PRIMARY OBJECTIVES. (1) CREATE A FRAMEWORK FOR INTEGRATION OF THE DATA AND SYSTEM VISUALS INTO NEW AND EXISTING PUBLIC SAFETY ORGANIZATION (PSO) APPLICATIONS. (2) DISPLAY MITIGATION RECOMMENDATIONS IN A WIDELY AVAILABLE AND USER-FRIENDLY COMMERCIAL OFF-THE-SHELF AUGMENTED REALITY (AR) INTERFACES. (3) RESEARCHING THE INTEGRATION OF MODELING TOOLS THAT CAN PROVIDE PREDICTIVE USER INTERFACES IN AR, OPTIMIZING THE INFORMATION BASED ON THE TASKS AND SITUATIONS AT H

$1.2M

2022–2025 · grant · CONNECTING MINORITY COMMUNITIES PILOT PROGRAM

THE DRAKE STATE COMMUNITY AND TECHNICAL COLLEGE'S CONNECTING MINORITY COMMUNITIES PROJECT AIMS TO ELIMINATE HISTORICAL INEQUITIES RELATED TO BROADBAND AND COMPUTER ACCESS WITHIN THE ANCHOR COMMUNITIES IN AND AROUND MADISON COUNTY, ALABAMA. THE PROPOSED PROGRAM WILL PROVIDE ACCESS TO LAPTOPS WITH BROADBAND ACCESS, HOME BROADBAND ACCESS FOR ANCHOR COMMUNITY MEMBERS, STREAMLINE ACCESS TO DRAKE STATE'S STUDENT SUPPORT RESOURCES AND ONLINE COURSES, AND DEMOCRATIZE ACCESS TO POSTSECONDARY EDUCATION AN

$2.4M

2022–2025 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: CYBERSECURITY AND THE RESILIENCE OF COMPUTING AND COMMUNICATIONS INFRASTRUCTURE IS AN AREA OF SIGNIFICANT AND GROWING CONCERN TO POLICYMAKERS, FEDERAL RESEARCH SPONSORS, AND THE PUBLIC. THE NATIONAL ACADEMIES? CYBER RESILIENCE FORUM WILL FACILITATE CROSS-SECTOR EXCHANGE OF IDEAS AMONG SCIENTISTS, PRACTITIONERS, AND GOVERNMENT OFFICIALS; ENABLE THE EARLY IDENTIFICATION OF RISKS AS WELL AS PROMISING APPROACHES TO IMPROVE THE RESILIENCE OF COMPUTING AND COMMUNICATIONS SYSTEMS; AND PROVIDE

$100k

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT: LOCAL AND REGIONAL STAKEHOLDER ENGAGEMENT, DIGITAL EQUITY SURVEY AND QUALITATIVE DATA COLLECTION & MAPPING, LOCAL GOVERNMENT COORDINATION AND TECHNICAL ASSISTANCE, AND STATEWIDE OUTREACH.THE PROPOSED PROJECT WILL RESULT IN THE DEVELOPMENT OF A ROBUST STATE DIGITAL EQUITY PLAN THAT WILL BENEFIT

$467.5k

2022–2024 · grant · CONGRESSIONALLY-IDENTIFIED PROJECTS

PURPOSE:THIS AWARD WILL COMPLETE INITIATION OF THE SOIL CARBON SOLUTION CENTER (SCSC) AT COLORADO STATE UNIVERSITY, THEREBY PROVIDING THE UNIVERSITY AND STAKEHOLDERS WITH MODELING AND DATA ACCESS CURRENT NOT AVAILABLE FROM THE UNIVERSITY. THE PROJECT WILL PROVIDE ACCESS TO SPECIALIZED TECHNOLOGIES, SERVICES, AND EXPERTISE TO SUPPORT THE SCIENTIFIC NEEDS AND ENHANCE THE SCIENTIFIC PRODUCTIV-ITY OF ITS STAFF MEMBERS WHILE SUPPORTING OUTREACH AND EDUCATION INITIATIVES. ACTIVITIES TO BE PERFORMED:T

$1M

2022–2025 · grant · SCIENCE, TECHNOLOGY, BUSINESS AND/OR EDUCATION OUTREACH

PURPOSE: THE UNIVERSITY OF NORTH CAROLINA AT CHARLOTTE WILL DEVELOP FOUR STANDARDS-BASED EDUCATION MODULES THAT STRENGTHEN THE CONNECTION BETWEEN BUILDING INFORMATION MODELING (BIM), A DIGITAL REPRESENTATION OF PHYSICAL AND FUNCTIONAL CHARACTERISTICS OF A FACILITY, AND ITS FUNDAMENTAL TECHNOLOGY AND THE CONNECTIONS BETWEEN BIM AND DOCUMENTARY STANDARDS. ACTIVITIES TO BE PERFORMED: THE MODULES WILL INCLUDE BIM FOR BUILDING DESIGN AND CONSTRUCTION, INFORMATION DELIVERY FROM CONSTRUCTION TO OPERATI

$99.9k

2022–2023 · grant · CONGRESSIONALLY-IDENTIFIED PROJECTS

PURPOSE:THE PURPOSE OF THIS GRANT IS TO ENHANCE THE QUALITY OF BIOMEDICAL AND CHEMICAL RESEARCH OPPORTUNITIES FOR SCIENCE FACULTYAND STUDENTS ENROLLED IN THE UNIVERSITY OF CHARLESTON'S BACHELOR'S DEGREE PROGRAMS IN BIOLOGY AND CHEMISTRY AS WELL ASTHE DOCTOR OF PHARMACY PROGRAM.ACTIVITIES TO BE PERFORMED:UNIVERSITY OF CHARLESTON WILL PURCHASE EQUIPMENT FOR ADVANCED BIOLOGICAL AND CHEMICAL MEASUREMENTS. THEY WILLPURCHASE A GAS CHROMATOGRAPH AND MASS SPECTROMETER INSTRUMENT (GC/MS), A MISEQ SYSTEM,

$379.4k

2022–2023 · grant · SCIENCE, TECHNOLOGY, BUSINESS AND/OR EDUCATION OUTREACH

PURPOSE: THE OVERALL GOAL OF THE PROJECT IS TO ADVANCE THE CURRENT BRUTE FORCE DEFAULT IDENTIFICATION?]AUTOMATED PREVENTION (BRDI-AP) ITERATION FROM A TECHNICAL READINESS LEVEL (TRL) 6 TO A TRL 7. TRL 6 IS DEFINED AS A DEMONSTRATION IN A RELEVANT ENVIRONMENT AND TRL 7 IS DEFINED AS A PROTOTYPE DEMONSTRATION IN THE FIELD.ACTIVITIES TO BE PERFORMED: THERE ARE THREE MAIN ACTIVITIES TO BE PERFORMED: 1) ENHANCE THE CURRENT PROTOTYPE TO A PRODUCTION]READY PROTOTYPE THAT IS ROBUST AND USER-FRIENDLY, IN

$195.5k

2022–2026 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: THIS PROJECT WILL DEVELOP A FRAMEWORK TO INFORM DECISION MAKING ON RETROFITTING INDIVIDUAL COLUMNS, OR GROUPS OF COLUMNS, WITH FIBER REINFORCED POLYMERS (FRP) IN NONDUCTILE REINFORCED CONCRETE (RC) BUILDINGS.ACTIVITIES TO BE PERFORMED: WITH THE SUPPORT OF AN INDUSTRY PANEL, THE INVESTIGATORS FIRST PLAN TO DEVELOP A MINIMUM OF THREE PROTOTYPE RC NONDUCTILE FRAME STRUCTURES. THE PROTOTYPE STRUCTURES WILL BE EVALUATED THROUGH INCREMENTAL DYNAMIC ANALYSIS IN THEIR UNRETROFITTED AND RETROFIT

$390k

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT CLOSING THE BROADBAND AVAILABILITY GAP AND SUPPORT THE DEVELOPMENT OF A FIVE-YEAR ACTION PLAN.THE PROPOSED PROJECT INCLUDES THE FOLLOWING PLANNING AND PRE-DEPLOYMENT ACTIVITIES: RESEARCH AND DATA COLLECTION, INCLUDING INITIAL IDENTIFICATION OF UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS CONSISTENT WITH RULES, REGULATIONS, AND PROCESSES COMMISSION HAS ESTABLISHED FOR MAKING DETERMINATIONS IN BROADBAND DATA MAPS; TRAINING FOR EMPLOYEES OF BROADBAN

$267.7M

2022–2025 · grant · CONGRESSIONALLY-IDENTIFIED PROJECTS

PURPOSE: PROVIDE RESOURCES AND KNOW-HOW TO INNOVATORS, WHICH WILL ACCELERATE MS AND US COMMERCIALIZATION AND MARKET ADOPTION OF GRAPHENE.ACTIVITIES TO BE PERFORMED: ESTABLISH A GRAPHENE PRODUCT VALIDATION LABORATORY, A CONCERTED GRAPHENE CENTER FOCUSED ON COMMERCIALIZATION AND VALIDATION.EXPECTED OUTCOMES: MORE US GRAPHENE-BASED INNOVATION AND COMMERCIALIZATION WILL OCCUR BY IMPLEMENTING THE GRAPHENE PRODUCT VALIDATION LABORATORY AND EXPECTED COMMERCIALIZATION OF THESE MATERIALS WOULD BE HIGH

$2M

2022–2024 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: THIS PROJECT WILL BUILD A DIGITAL-TWIN ENABLED TESTBED WITH THE STATE-OF-THE-ART USER INTERFACE/USER EXPERIENCE TECHNOLOGIES AND ADVANCED SIMULATION MODELS TO PROVIDE A PHOTOREALISTIC VIRTUAL REALITY ENVIRONMENT FOR FIRST RESPONDERS AND EMERGENCY MANAGERS TO ENGAGE, EXPERIENCE, AND EXPLORE THE LATEST SENSING AND COMMUNICATION TECHNOLOGIES.ACTIVITIES TO BE PERFORMED: KEY ACTIVITIES OF THE PROJECT INCLUDE COLLECTING DATA AT DISASTER CITY, DEVELOPING 3D SURFACE MODELS ACCESSIBLE FOR MULTIP

$1.2M

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT CLOSING THE BROADBAND AVAILABILITY GAP AND SUPPORT THE DEVELOPMENT OF A FIVE-YEAR ACTION PLAN.THE PROPOSED PROJECT INCLUDES THE FOLLOWING PLANNING AND PRE-DEPLOYMENT ACTIVITIES: RESEARCH AND DATA COLLECTION, INCLUDING INITIAL IDENTIFICATION OF UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS CONSISTENT WITH RULES, REGULATIONS, AND PROCESSES COMMISSION HAS ESTABLISHED FOR MAKING DETERMINATIONS IN BROADBAND DATA MAPS; PUBLICATIONS, OUTREACH, AND COMMUN

$1.2B

2022–2026 · grant · BROADBAND INFRASTRUCTURE PROGRAM

PURPOSE: THE SCOTT COUNTY RURAL BROADBAND EXPANSION PROJECT IS A LAST MILE PROJECT LOCATED IN SCOTT COUNTY, KENTUCKY. THE LEAD APPLICATION IS SCOTT COUNTY FISCAL COURT, PROVIDING PROJECT OVERSIGHT, AS WELL AS FINANCIAL AND LEGAL RESPONSIBILITY. THE SUBRECIPIENT ISP IS SPECTRUM, PROVIDING CONSTRUCTION SERVICES TO BUILD OUT AND MAINTAIN NETWORK. CTC TECHNOLOGY AND ENERGY WILL BE A COLLABORATOR AND PROVIDE GRANT CONSULTATION SERVICES.ACTIVITIES: THE PROJECT WILL USE SPECTRUM'S FTTP EPON ARCHITECTUR

$3.1M

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT: COMMUNITY OUTREACH AND ENGAGEMENT; CONDUCT DATA ANALYSIS; CREATE A STRATEGY AND IMPLEMENTATION PLAN; CONDUCT NEEDS ASSESSMENTS. THE PROPOSED PROJECT WILL RESULT IN THE DEVELOPMENT OF A ROBUST STATE DIGITAL EQUITY PLAN THAT WILL BENEFIT THE STATE OF FLORIDA AND PRINCIPALLY UNSERVED AND UNDERSERV

$1.1M

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT: THIS GRANT WILL BE USED TO FUND A PLAN DEVELOPED BY A QUALIFIED ENTITY, WHICH WILL IDENTIFY COVERED POPULATIONS AND ITS DIGITAL EQUITY CHALLENGES, DEVELOP STRATEGIES TO ADDRESS SAID CHALLENGES, AND PROVIDE BENCHMARKS FOR THE STATE TO CONSIDER THAT WOULD DENOTE PROGRESS AND SUCCESS. THE PROPOSED

$511k

2022–2024 · grant · CONGRESSIONALLY-IDENTIFIED PROJECTS

PURPOSE: A REPORT PRODUCED BY ENTERPRISEKC (EKC) IN 2020 INDICATED THAT THERE ARE OVER 3,600 CYBERSECURITY JOB OPENINGS IN THE GREATER KC AREA ALONE, REPRESENTING $350M IN UNREALIZED SALARIES. THE REPORT CONCLUDES THAT KANSAS UNIVERSITIES ARE NOT PRODUCING ENOUGH COMPUTER AND INFORMATION-SCIENCE GRADUATES TO FILL THESE MARKET DEMANDS. EMPORIA STATE UNIVERSITY WILL ADDRESS THESE ISSUES BY EXPANDING THEIR CAPABILITY VIA A CYBERSECURITY CENTER TO DEVELOP MORE TALENT QUALIFIED TO MEET THE JOB MARKE

$1.5M

2022–2023 · grant · SCIENCE, TECHNOLOGY, BUSINESS AND/OR EDUCATION OUTREACH

PURPOSE: THE PURPOSE OF THIS PROJECT IS TO BUILD, DEMONSTRATE, AND EVALUATE IN CLASSROOM SETTINGS OF HAZVR, A HAZMAT TRAINING PROJECT.ACTIVITIES TO BE PERFORMED: THIS PROJECT WILL BUILD, DEMONSTRATE, AND EVALUATE IN CLASSROOM SETTINGS OF HAZVR. HAZVR WILL BE A HAZMAT AIR-MONITORING TRAINING MODULE THAT REINFORCES CONCEPTS TAUGHT IN CLASSROOMS USING VIRTUAL REALITY (VR)1 AIR MONITOR INSTRUMENTS WITHIN THE CONTEXT OF LOW-FREQUENCY HIGH-RISK HAZMAT INCIDENTS.EXPECTED OUTCOMES: THE PROJECT EXPECTS T

$199.9k

2022–2025 · grant · CONGRESSIONALLY-IDENTIFIED PROJECTS

PURPOSE: ADVANCE AND EXPAND JILAS RESEARCH CAPABILITY WITH NEW RESEARCH EQUIPMENT, MOST NOTABLY FOR JILAS MULTI-USER FABRICATION FACILITIES.ACTIVITIES TO BE PERFORMED: ACQUIRE AND INSTALL EQUIPMENT NEEDED FOR PLANNED SCIENTIFIC INVESTIGATION AND TRAINING OF NEXT-GENERATION RESEARCHERS.EXPECTED OUTCOMES: JILA IS A COLORADO-BASED RESEARCH INSTITUTE THAT CONTRIBUTES SUBSTANTIALLY TO U.S. LEADERSHIP IN QUANTUM SCIENCE, A TECHNOLOGICAL AREA THAT HAS BEEN IDENTIFIED AS STRATEGICALLY IMPORTANT TO TH

$950k

2022–2025 · grant · SCIENCE, TECHNOLOGY, BUSINESS AND/OR EDUCATION OUTREACH

PURPOSE: THE PURPOSE OF THE AAAS SCIENCE & TECHNOLOGY POLICY FELLOWSHIP AT NIST IS TO PROVIDE A YEAR-LONG, EXPERIENTIAL LEARNING AND CIVIC ENGAGEMENT OPPORTUNITY THAT BUILDS THE CAPACITY OF SCIENTISTS AND ENGINEERS TO BETTER APPLY AND COMMUNICATE SCIENCE WITHIN A POLICY CONTEXT. ACTIVITIES TO BE PERFORMED: AAAS FELLOWS WILL HAVE OPPORTUNITIES TO ENGAGE ON A RANGE OF MEASUREMENT SCIENCE, TOOLS, STANDARDS AND OTHER ACTIVITIES CRITICAL TO THE GROWTH OF HIGH-VALUE, INNOVATIVE ECONOMIC SECTORS.EXPECT

$1.7M

2022–2025 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: RADIO-FREQUENCY (RF) CHANNEL MEASUREMENT AND MODELING REPRESENTS, IN A COMPACT MATHEMATICAL FORM, THE PHYSICAL MEDIUM THROUGH WHICH WIRELESS SIGNALS PROPAGATE, AND IS USED TO DESIGN NEXT-GENERATION (NEXTG 5G, 6G, AND BEYOND) DEVICES AND NETWORKS. AS THE GS GET HIGHER AND HIGHER, THE NETWORK TECHNOLOGY BECOMES MORE AND MORE COMPLEX. FOR EXAMPLE, MASSIVE PHASED-ARRAY ANTENNAS WITH HUNDREDS OF ELEMENTS HAVE BECOME A CRITICAL PART OF THE SYSTEM DUE TO THEIR ABILITY TO COMBINE MANY SIGNALS

$250k

2022–2025 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: THE PURPOSE OF THIS GRANT IS TO RESEARCH, DEVELOP, AND PUBLISH METHODS AND DESIGNS FOR THE MEASUREMENT OF ULTRA-LOW, SINGLE DEFECT LEVEL CAPACITANCES, CHARGE PUMPING OF TRANSISTORS, AND FOR THE TESTING OF RANDOM NUMBER GENERATION FROM STOCHASTIC NANODEVICES. ACTIVITIES TO BE PERFORMED: THREE DIFFERENT CLASSES OF ELECTRONIC MEASUREMENT SYSTEMS WILL BE BUILT. FIRST ARE INTEGRATED VOLTAGE CONTROLLED OSCILLATORS FOR HIGH FREQUENCY CAPACITANCE-VOLTAGE MEASUREMENTS OF INTEGRATED CIRCUITS. SEC

$100k

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT CLOSING THE BROADBAND AVAILABILITY GAP AND SUPPORT THE DEVELOPMENT OF A FIVE-YEAR ACTION PLAN.THE PROPOSED PROJECT INCLUDES THE FOLLOWING PLANNING AND PRE-DEPLOYMENT ACTIVITIES: RESEARCH AND DATA COLLECTION, INCLUDING INITIAL IDENTIFICATION OF UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS CONSISTENT WITH RULES, REGULATIONS, AND PROCESSES COMMISSION HAS ESTABLISHED FOR MAKING DETERMINATIONS IN BROADBAND DATA MAPS; PUBLICATIONS, OUTREACH, AND COMMUNI

$416.7M

2022–2027 · grant · MANUFACTURING EXTENSION PARTNERSHIP

PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE MANUFACTURING EXTENSION SERVICES TO PRIMARILY SMALL AND MEDIUM-SIZED MANUFACTURERS IN THE STATE OF MISSISSIPPI. ACTIVITIES TO BE PERFORMED: THROUGH ITS COLLABORATIONS AT THE FEDERAL, STATE, AND LOCAL LEVEL, AND INSTITUTES OF HIGHER EDUCATION, THE CENTER WILL WORK WITH MANUFACTURERS IN THE AREAS OF SUPPLIER SCOUTING, PRODUCT DESIGN, AUTOMATION, WORKFORCE DEVELOPMENT AND PLANNING, AND TRAINING. THE CENTER WILL CONDUCT BUSINESS COMPETITIVE REVIEW A

$5.3M

2022–2026 · grant · SCIENCE, TECHNOLOGY, BUSINESS AND/OR EDUCATION OUTREACH

PURPOSE: THE PURPOSE OF THIS GRANT IS TO DEVELOP INTERDISCIPLINARY COURSE CURRICULA IN PLASTICS CIRCULARITY, WITH THREE DIFFERENT COURSES IN THE DIVISION OF ENERGY, MATTER AND SYSTEMS AT THE UNIVERSITY OF MISSOURI-KANSAS CITY IN KANSAS CITY, MI: A CRITICAL THINKING COURSE, A RESEARCH SKILL TRAINING COURSE, AND A POLYMER CHARACTERIZATION LAB COURSE.ACTIVITIES TO BE PERFORMED: A MULTIDISCIPLINARY TEAM OF FACULTY, WITH HELP FROM GRADUATE TEACHING ASSISTANTS WILL DEVELOP CURRICULA AND IMPLEMENT THE

$500k

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT: COMMUNITY AND STAKEHOLDER ENGAGEMENT; DATA COLLECTION AND ANALYSIS; REPORT DEVELOPMENT AND DISTRIBUTION. THE PROPOSED PROJECT WILL RESULT IN THE DEVELOPMENT OF A ROBUST STATE DIGITAL EQUITY PLAN THAT WILL BENEFIT THE STATE OF IDAHO AND PRINCIPALLY UNSERVED AND UNDERSERVED COVERED POPULATIONS ST

$384.6k

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT: 1) DEVELOPING A CORE PLANNING TEAM (CORE TEAM), WHERE AT LEAST ONE MEMBER OF THE CORE TEAM WILL ALSO SERVE ON THE BEAD PLANNING TEAM; 2) ANALYZING DATA AND DEPLOY SURVEYS TO BETTER UNDERSTAND THE BARRIERS FACED BY EACH COVERED POPULATION; 3) HOSTING LISTENING SESSIONS TO BETTER UNDERSTAND THE B

$1.4M

2022–2023 · grant · MEASUREMENT AND ENGINEERING RESEARCH AND STANDARDS

PURPOSE: THE PURPOSE OF THIS GRANT IS TO DEVELOP A NOVEL MEANS TO CHARACTERIZE STRESS FIELDS THAT DEVELOP DURING THE ADDITIVE MANUFACTURING OF ENGINEERING ALLOYS AS THEY FORM. ACTIVITIES TO BE PERFORMED: THIS WORK WILL CREATE A SERIES OF SURROGATE MODELS THAT WILL BE CAPABLE OF DETERMINING METRICS DESCRIBING STRESS DISTRIBUTIONS CONTAINED WITHIN DIFFRACTION VOLUMES DURING IN-SITU ADDITIVE MANUFACTURING EXPERIMENTS. THIS WILL BE ACCOMPLISHED BY PERFORMING A SERIES OF THERMODYNAMIC CALCULATIONS TO

$68.6k

2022–2025 · grant · BROADBAND INFRASTRUCTURE PROGRAM

PURPOSE: THE STATE OF MISSOURI DEPARTMENT OF ECONOMIC DEVELOPMENT PROJECT IS A LAST MILE, FIBER DEPLOYMENT IN 14 SERVICE AREAS ACROSS THE COUNTIES OF BUTLER, MARION, SHELBY, MONROE, JASPER, PULASKI, ST. CHARLES, LIVINGSTON, MCDONALD, MONTGOMERY, AND BOONE. THIS APPLICATION WAS SUBMITTED BY THE STATE OF MISSOURI DEPARTMENT OF ECONOMIC DEVELOPMENT, WHO HAS ENTERED INTO AN ELIGIBLE PARTNERSHIP WITH TEN ISP COMPANIES. THE PROJECT HAS BEEN SEPARATED BY THE ISP COMPANIES THAT ARE SERVICING SPECIFIC CO

$42.2M

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

THE BEAD PROGRAM PROVIDES FEDERAL FUNDING FOR GRANTS TO ELIGIBLE ENTITIES FOR BROADBAND PLANNING, DEPLOYMENT, MAPPING, EQUITY, AND ADOPTION ACTIVITIES. THE PROGRAM'S PRINCIPAL FOCUS WILL BE ON DEPLOYING BROADBAND SERVICE TO UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS. ELIGIBLE ENTITIES THAT DEMONSTRATE THEY WILL BE ABLE TO ENSURE SERVICE TO ALL UNSERVED AND UNDERSERVED LOCATIONS WILL BE FREE TO PROPOSE PLANS THAT USE REMAINING FUNDS IN A WIDE VARIETY OF WAYS, BUT NTIA UNDERSCORES ITS STRONG PRE

$314M

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT CLOSING THE BROADBAND AVAILABILITY GAP AND SUPPORT THE DEVELOPMENT OF A FIVE-YEAR ACTION PLAN.THE PROPOSED PROJECT INCLUDES THE FOLLOWING PLANNING AND PRE-DEPLOYMENT ACTIVITIES: THE PROPOSED PROJECT INCLUDES: RESEARCH AND DATA COLLECTION, INCLUDING INITIAL IDENTIFICATION OF UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS CONSISTENT WITH RULES, REGULATIONS, AND PROCESSES COMMISSION HAS ESTABLISHED FOR MAKING DETERMINATIONS IN BROADBAND DATA MAPS; PUB

$415.3M

2022–2024 · grant · ARRANGEMENTS FOR INTERDISCIPLINARY RESEARCH INFRASTRUCTURE

TITLE: INDUSTRIAL ARTIFICIAL INTELLIGENCE CONSORTIUM TO ADVANCE HIGH MIX PRODUCTIONPURPOSE: THE PROJECT WILL DEVELOP A ROADMAP TO ADVANCE HIGH-MIX PRODUCTION (I.E., MANUFACTURING OF A LARGE VARIETY OF PRODUCTS IN RELATIVELY SMALL QUANTITIES) ACROSS DIVERSIFIED SECTORS, INCLUDING SEMICONDUCTOR MANUFACTURING, MEDICAL PRODUCTS MANUFACTURING, AND ENERGY STORAGE DEVICES, AND OTHERS FOR US MANUFACTURERS TO IMPROVE OVERALL COMPETITIVENESS IN A GLOBAL MARKETPLACE. ACTIVITIES TO BE PERFORMED:1) ESTABLISH

$285.9k

2022–2025 · grant · SCIENCE, TECHNOLOGY, BUSINESS AND/OR EDUCATION OUTREACH

PURPOSE: THE RECIPIENT PLANS TO STUDY, DESIGN, BUILD AND TEST A PILOT REGIONAL QUALITY CONTROL (QC) CENTER THAT PROVIDES METROLOGY TESTING SERVICES TO SMALL AND MID-SIZED COMPANIES PRODUCING THERMOPLASTIC AND RESIN ADDITIVELY MANUFACTURED PARTS.ACTIVITIES TO BE PERFORMED: ACTIVITIES TO PERFORMED IN PHASES I AND II ARE AS FOLLOWS:PHASE I: DESIGN A QC CENTER THAT ENABLES REGIONAL CENTRALIZATION OF QUALITY TESTING CAPABILITIES FOR SMALL TO MID-SIZED ADDITIVE MANUFACTURING COMPANIES, THAT CAN BE ACT

$800k

2022–2024 · grant · STATE DIGITAL EQUITY PLANNING AND CAPACITY GRANT

THE PROPOSED PROJECT WILL SUPPORT CLOSING THE DIGITAL EQUITY GAP AND THE DEVELOPMENT OF A STATEWIDE DIGITAL EQUITY PLAN. THE PROPOSED PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO SUPPORT PLAN DEVELOPMENT: STAFF RECRUITMENT AND DEVELOPMENT, COMMUNITY AND STAKEHOLDER ENGAGEMENT, DATA COLLECTION AND ANALYSIS, AND REPORT DEVELOPMENT AND DISTRIBUTION. THE PROPOSED PROJECT WILL RESULT IN THE DEVELOPMENT OF A ROBUST STATE DIGITAL EQUITY PLAN THAT WILL BENEFIT THE STATE OF NORTH DAKOTA AND PRINCIPALLY

$515.3k

2022–2032 · grant · BROADBAND EQUITY, ACCESS, AND DEPLOYMENT PROGRAM

PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT CLOSING THE BROADBAND AVAILABILITY GAP AND SUPPORT THE DEVELOPMENT OF A FIVE-YEAR ACTION PLAN.THE PROPOSED PROJECT INCLUDES THE FOLLOWING PLANNING AND PRE-DEPLOYMENT ACTIVITIES: RESEARCH AND DATA COLLECTION, INCLUDING INITIAL IDENTIFICATION OF UNSERVED LOCATIONS AND UNDERSERVED LOCATIONS CONSISTENT WITH RULES, REGULATIONS, AND PROCESSES COMMISSION HAS ESTABLISHED FOR MAKING DETERMINATIONS IN BROADBAND DATA MAPS; THE DEVELOPMENT OF A PRELIMINARY B

$272M