SpaceX is preparing to send Starship on its first orbital mission, with Flight 14 targeted for no earlier than September 28. The launch still needs regulatory approval, and the date will hold only if the countdown runs cleanly.
The plan calls for the ship to reach an orbit near 275 kilometers and circle Earth about six times over roughly ten hours. During that time it would deploy 26 Starlink V3 satellites before coming down in the Pacific Ocean off Chile. The booster, Booster 21, would perform a boostback maneuver and a landing burn before splashing down in the Gulf of Mexico. No tower catch is planned for this flight.
Flight 15 is the next step that matters most. If Flight 14 succeeds, it would be the first realistic opportunity to attempt catching the ship with the launch tower. That catch has not yet been demonstrated, so its timing remains uncertain. A debut flight from Launch Complex 39A at Kennedy Space Center, Flight 16, is the best-case scenario and would need to happen by the end of 2026.
Pad 39A has its own history. It was built in the 1960s to support the Saturn V moon rocket, then served the Space Shuttle and later Falcon rockets. NASA leased the site to SpaceX in 2014. Major construction there appears complete, and the tank farm is now active. The launch tower's chopstick arms now use electromechanical actuators in place of hydraulic pistons. A booster for a 39A debut could be sent from Texas, depending on how Flight 15's recovery goes.
We rewrote this story on 4 November 2026 after an editorial review.
Credit. Based on reporting by Chris Bergin and Eleanor Day for NASASpaceflight. Is this your work? Write to us.
628





